2020 – 2022 Capital Campaign
We have kicked off our “Living Our Legacy – Anticipating the Future” Capital Campaign, a 3-year campaign to pay the loan on our new church. Pledges made to this campaign … Read More
Serving Liberty MO Since 1837
We have kicked off our “Living Our Legacy – Anticipating the Future” Capital Campaign, a 3-year campaign to pay the loan on our new church. Pledges made to this campaign … Read More
As of January 1, we exceeded the campaign Celebration Goal of $3 million and are well on the way to the to the Challenge Goal of $4.5 million. To see … Read More
[advanced_iframe src=”https://stjames-liberty.org/wp-content/uploads/2019/09/St-James-Information-Brochure_final.pdf” width=”100%” height=”1000px” ]
Click below to view the Campaign Video
Despite difficulties with the mud we have finished the efis on the back (Eastern) portion of the church. The two upper windows, including the wood, will be replaced with stained … Read More
Q. During the church survey and subsequent town hall meetings, several parishioners voiced the desire for a working bell tower. The original artist’s depictions showed a building with two bell towers. What … Read More
Q. How long will it take to build once we break ground? A. Projecting timelines for a construction project of this size can be a challenge. We wish to give … Read More
Q. I was wondering why the design of the outside of the church changed? Our church directory, cookbook, and even our new sign all had the original church design on … Read More
Q. Is the front entrance handicap accessible? A. The front of church will have a gracefully sloping walkway from the drop off area up to the doors to the narthex. … Read More